New Aveo Engineering Headquarters Building

Aveo Florida finalizes new manufacturing and engineering facility building concept design. Now submitted for architectural building and site drawings. This green construction and operation facility is planned for our commercial building site which is close to the already operating Aveo Composites Production facility off US 1.

AEF_Facility Concept 3_Fotor1

AEF_Facility Concept 3_Fotor6 copy

AEF_Facility Concept 3_Fotor3-1 copy copy

AEF_Facility Concept 3_Fotor1 copy
This facility will house assembly operations for a variety of Aveo product divisions, plus an engineering design center and distribution warehouse. This replaces the proposed manufacturing site for Flagler Airport industrial park (outside airport fence) which has been terminated due to the swamp status of the offered leased land. Aveo is committed to its growth in Flagler County, despite the obstacles thrown at it by the duplicitous airport manager and the naivety of the Daytona newspaper editorial staff who have never created a job in their lives.

The user of this website is forewarned that the information presented herein is general and informational only. Aveo is not responsible for misinterpretations, typos, syntax errors, or translation mistakes as the legal and governing language of Aveo Czech is the Czech language.  Should there be any questions they should be directed to Aveo at info@aveoengineering,com for clarification or explanation. No liability is assumed or accepted for any activities based upon the user's use of anything presented herein.

©2024 Aveo Engineering Group, s.r.o. • All Rights Reserved. • PATENTS PENDING WORLDWIDE • Terms of Use • Privacy Policy

Any links to or use of material on our website without prior written permission will be aggressively prosecuted to the letter of the law worldwide

Log in with your credentials

Forgot your details?